CasaDelGato - Images from the House of the Cat

Home > Electric Vehicle > Ford F250 EV Conversion > Assemble Motors 2

2009-02-17_15-54-18.JPG
Painted Motor Mount8029 viewsI then sandblasted it all ,and painted it.
2009-02-21_13-48-38.JPG
Motors Installed8926 viewsEverything is in and bolted down. The framework is mounted to the original rubber engine mounts that used to support the 460cui Gas Engine.
2009-03-24_16-13-34.JPG
Battery Box Bottom10160 viewsThis is the bottom of the battery box. It is 3/4" plywood with a 2x2 edge frame.
The colored boxes are pieces of plywood cut to the size of Golf Cart batteries.
2009-03-24_16-15-18.JPG
9651 viewsThis shows how there will be 6 batteries across at the back. (there are 8 across at the front)
16 files on 2 page(s) 2