CasaDelGato - Images from the House of the Cat

Image search results - "electric"
100_0000.jpg
1st half coupler on motor2867 viewsMounted 1/2 the coupler on the first motor.
100_0147.jpg
2nd half coupler mounted2502 viewsMounted the other half the coupler on the other motor.
100_0149.jpg
Putting them together3438 viewsBoth motors together! Bolted to the motor-motor mount.
100_0154.jpg
Bolting coupler together3757 viewsWe hadn't realized just how difficult it was going to be to tighten the bolts holding the coupler together. It was really awkward and hard. Took 2 people. (one turning the motor, the other holding the allen wrench.)
This was compouned when we discovered another alignment problem. Turns out that the end bells of the Impulse 9 motors aren't that accurately machine. We had a 10-20 thousandths variance between them that we had to shim.
100_0159.jpg
Getting ready to put on the Flywheel adapter2709 viewsThe Flywheel adapter is also a heated press-fit. We made sure we had spacers to keep it from going on the shaft too far.
100_0163.jpg
Flywheel adapter is on!3785 viewsCooling it down after pressing it on to the shaft. (more like setting it on, and tapping it gently down.)
100_0172.jpg
Flywheel and cluth mounted3619 viewsBolted things together, bolted on the flywheel and clutch assemblies.
100_0174.jpg
Motor and Transmission4232 viewsHere is the full drive assembly. Both Impulse 9 motors, transmission and transfer case.
We are going to lift it into the truck from the bottom.
2008-04-18_15-28-44.JPG
Pulling the engine11431 viewsRemoving the 460cui gas engine. (Having a forklift really made this easier.)
All 762 pounds of it!
2008-12-27_11-47-24.JPG
Motor-Motor mount ends3212 viewsWe started with some scrap plate steel from the local recycle place.
2008-12-27_11-58-40.JPG
Motor-Motor mount body2342 viewsAnd a piece of old iron pipe from the same place.
2008-12-28_15-04-10.JPG
Motor-Motor mount rough2470 viewsHere is the mount after some work in the lathe on both the raw pieces.
57 files on 5 page(s) 1